Skip to content
Mecklenburg County · Charlotte, NC

Charlotte’s Commercial Electrical Remodeling Contractor

Uptown tenant upfits, South End and NoDa fit-ups, and panel and lighting reworks wired around your business hours. Bobby Shaver is the engineer and the tradesman on the job, so the plan and the install stay on the same page in the field.

Why Charlotte businesses call for a remodel

The space is changing. The wiring has to change with it.

Charlotte’s commercial corridors keep turning over faster than almost anywhere in the Carolinas. An uptown office tower splits a floor into small-business suites, a South End mill building takes on a new brewery or restaurant tenant, a NoDa storefront changes hands, or a flex warehouse off the I-85 corridor adds equipment. Every one of those changes carries an electrical scope, and the wiring that fit the old use rarely fits the new one. That is the work Bobby Shaver does: taking a Charlotte space that is changing and making sure the power, panels, circuits, and lighting change with it, on permit and on schedule.

The thing that separates 310 Construction on a commercial remodel is that Bobby is both the engineer and the licensed tradesman on the job. On a lot of upfits the electrical drawings and the field install drift apart, because the person who drew it up is not the person landing the wire. Here they are the same person. The plan reflects what actually gets built, the load calculations are run against the real new use, and the coordination with the GC, the landlord or property manager, and the other trades holds together, which matters on a tight uptown build calendar where a blown inspection stalls the whole job.

A remodel is also the natural moment to fix the panel. If the new layout adds kitchen loads for a restaurant, more circuits for a coworking floor, HVAC, or EV charging, the service often needs a subpanel or an upgrade to carry it. Bobby runs that calculation up front so the panel is not the thing that trips a year after the space reopens. And because occupied Charlotte businesses can rarely go fully dark, the power-off and loud phases get scheduled after hours or on weekends, planned and communicated instead of sprung on the tenant.

Sequencing is where an upfit is won or lost, and it is easy to get wrong. The electrical work lands in two phases that have to fall in the right order against the rest of the trades. The rough-in, the conduit, the boxes, the home runs back to the panel, has to be roughed and inspected before the drywall crew closes the walls, because a missed circuit found after the walls are up means cutting open finished work and re-inspecting. The finish, the devices, the fixtures, and the final panel connections, comes after the ceilings and walls are in and gets timed toward the certificate of occupancy. On a tight South End or uptown calendar, the trade that stalls the whole job is usually the one whose rough-in was not ready when the drywallers arrived. Because Bobby is coordinating his own rough-in against the GC’s schedule rather than handing a drawing to a separate crew, that hand-off holds, and the drywall goes up on the day it was supposed to.

Call (704) 575-9463 or reach out online to scope the project. See finished commercial work on the project gallery.

01

Walk-through and load calc

Bobby reviews the drawings and the new use, runs the load calculation, and flags whether the existing service can carry the upfit.

02

Permit and coordination

The permit is pulled through the City of Charlotte or Mecklenburg County and the schedule coordinated with the GC, landlord, and other trades.

03

Rough-in and finish

Circuits, panels, and lighting are roughed in before drywall and finished on schedule, with power-off phases planned around business hours.

04

Inspection and CO

The inspections are scheduled and passed so the electrical scope is not the thing holding up the certificate of occupancy.

Remodel work we handle

Commercial reworks for Charlotte spaces

Uptown Tenant Upfits

A new small-business tenant in an uptown Charlotte suite needs the electrical scope built to their layout and use. Bobby wires the upfit from the drawings and coordinates the CO.

Restaurant and Brewery Fit-Ups

South End and NoDa kitchen loads, tap and cooler circuits, and point-of-sale power add up fast. Bobby sizes and lands them so the space opens ready and inspected.

Office and Coworking Reconfigs

Splitting, combining, or reworking Charlotte office suites means moving circuits, data-adjacent power, and lighting. Bobby reworks it cleanly on permit.

Panel and Service Reworks

When the new use outgrows the panel, Bobby adds a subpanel or upgrades the service so the remodel is not running against a maxed-out board.

Lighting Redesign

An upfit is the time to move to efficient LED layouts, add controls, and fix the dim or dated lighting the previous tenant left behind.

Medical and Salon Fit-Ups

Dental, medical, and salon spaces carry specific equipment loads and dedicated circuits. Bobby scopes them to the equipment list and to code.

Serving Mecklenburg County

Charlotte’s commercial spaces turn over fast, and the wiring has to keep up

Between the uptown office and coworking scene, the South End and NoDa restaurant and retail boom, and the flex and warehouse space in the industrial corridors, Mecklenburg County has one of the busiest streams of upfits and fit-ups in the region. The businesses that open on time are the ones whose electrical scope was planned, permitted, and coordinated, not improvised after the walls went up.

The specialty fit-ups are the ones where the load calc earns its keep. A dental or medical suite carries dedicated circuits for chairs, sterilizers, and imaging gear that a general office never saw. A brewery or taproom on a South End or NoDa mill floor stacks glycol chillers, tap systems, and kitchen loads onto a service that was sized for something quieter. A salon runs a bank of stations and dryers. In each case the equipment list, not the square footage, is what sets the electrical scope, and pricing it off floor area the way a generic bid does is how a panel ends up maxed the month the space opens. Bobby scopes those fit-ups to the actual equipment schedule and to code, so the circuits are dedicated where they need to be and the service carries the real draw.

Bobby works Charlotte, Mint Hill, Matthews, Pineville, and the surrounding Mecklenburg County commercial market from the Norwood base, inside the 50-mile radius. Bring the drawings early and the scope stays ahead of the schedule. Call (704) 575-9463 or contact us online to walk the space.

Common questions

Charlotte commercial remodels, answered

Can you work around our business hours on a Charlotte upfit?
Yes. Occupied retail, restaurant, and office spaces in uptown, South End, and NoDa often need the loud or power-off phases done after hours or on weekends so the business keeps running. Bobby scopes the sequence up front so shutdowns are planned, communicated, and short. A shop or cafe staying open through a fit-up is a scheduling problem we solve at the walk-through, not a surprise.
Do you coordinate with the general contractor on a Charlotte tenant upfit?
Yes. On a tenant upfit Bobby works from the electrical drawings and coordinates with the GC, the landlord or property manager, and the other trades so the rough-in lands before drywall and the finish lands on schedule. Being both the engineer and the tradesman on the job means the plan and the install do not drift apart in the field, which matters on a tight uptown build calendar.
Does a commercial remodel in Charlotte need a permit?
Almost always. Adding or moving circuits, changing panels, and reworking lighting in a commercial space is permitted and inspected work in North Carolina. Bobby pulls the permit through the City of Charlotte or Mecklenburg County and coordinates the inspections so the certificate of occupancy is not held up by an electrical flag.
Can you upgrade the panel and add capacity during a Charlotte fit-up?
Yes. An upfit is often the right time to add a subpanel or upgrade the service if the new layout adds equipment, kitchen loads, or EV charging. Bobby runs the load calculation against the new use so the panel is not the thing that fails a year after the space opens.
What kinds of Charlotte commercial spaces do you remodel?
Uptown office suites and coworking floors, South End and NoDa retail and restaurants, medical and dental fit-ups, salons, breweries and taprooms, warehouses and flex space, and multi-tenant buildings across Charlotte and Mecklenburg County. If the space is changing use or layout and the wiring has to follow, that is the work.
How is the electrical sequenced so it doesn’t stall our Charlotte upfit?
The electrical lands in two phases that have to fall in order against the other trades. The rough-in, the conduit, boxes, and home runs back to the panel, is done and inspected before the drywall crew closes the walls, because a circuit missed after the walls are up means cutting open finished work. The finish, the devices, fixtures, and final panel connections, comes after the walls and ceilings and is timed toward the certificate of occupancy. Because Bobby coordinates his own rough-in against the GC’s schedule rather than handing a drawing to a separate crew, the hand-off holds and the drywall goes up on schedule.

Bring the drawings, we’ll wire the Charlotte upfit

Load calc against the new use, permit, coordination, and inspection, handled around your business hours.

(704) 575-9463